Select rods and bearers from trial loads, check each trapeze and save run schedules for reporting. Guide →

Design inputs

1. Duct & loads
mm
mm
mm
mm
kg/m³

Edit detailed parameters
kg/m
kg/m
kg
2. Two-rod trapeze arrangement
m
m
m
m

Edit detailed parameters
mm
3. Rods, bearer & anchors

Edit detailed parameters
kg/m
MPa
cm³
cm⁴
MPa
MPa
kN

Results

Method & scope

Automatic selection checks bearer bending/deflection and rod tension independently, trying candidates from small to large. The largest candidate must still be checked; anchors are not selected. Editing a rod/bearer or span switches that setting to Manual.

Automatic selection screens M8–M20 rods and RHS 40×40×2, 60×40×2, 80×40×2 for rod tension, bearer bending and deflection; it does not select anchors. Editing a rod/bearer or span switches that setting to Manual. Verified-data mode never replaces section properties.

Preliminary mode assumes class 4.6 rods (fy=240 MPa) and S235 RHS (fy=235 MPa). The default divisor 3 is a tool screening assumption, not a prescribed design factor under an applicable code. I=(b h³−bi hi³)/12; Z=I/(h/2); self-weight uses section area ×7850 kg/m³. Ideal sharp corners with h vertical; these are not actual product catalogue properties.

Two vertical rods, symmetric loading and a simply supported bearer. Duct load over one hanger spacing is conservatively represented as a centre point load, compared with a symmetric load spread over the duct width. Bearer self-weight is uniform; each rod self-weight adds to anchor tension.

Mmax = P L/4 + Wbearer L/8; centre deflection = P L³/(48 EI) + 5 Wbearer L³/(384 EI). Rod stress = R/As; bearer bending stress = M/Z. As is the metric coarse-thread tensile stress area, not the nominal circular area.

Entered limits must be compatible allowable values for the service-load basis, with suitable safety factors already included. Do not enter ultimate failure loads or unconverted design resistances. Without a reference/capacity value, requirements are shown without a passing verdict.

Angle/channel names alone do not establish capacity: I and Z must match the bending axis and installed orientation. Torsion, instability, perforations, rod–bearer connections, local shell bearing, round-duct saddles, anchor substrate, edge distances, anchor groups and supporting structure are not checked.

Static gravity loads only; seismic, wind, vibration, person loads, risers, cantilevers, fire/smoke-rated ducts and code-required hanger spacing are excluded. Entered spacing is a trial assumption, not a recommended maximum.

Example trapeze count = ceil(run length/spacing)+1, including both ends of each independent run. The entered spacing remains the conservative tributary length for checks. Bearer total is the rod-to-rod span only, excluding end extensions; rod totals exclude splices, nuts and embedment. Shared end supports across rows are not merged.